ENবাংলা

Purple Line

Joka ↔ Majerhat — 7 stations, 8.1 km.

7

Stations

8.1 km

Length

2022

Opened

21 min

Peak frequency

Joka ↔ Majerhat

The Purple Line (Line 3), the Joka–Esplanade corridor, currently runs as an elevated 8.1 km segment between Joka and Majerhat in the south-west of Kolkata, serving the Behala and Joka neighbourhoods that previously had no rail link.

The first stretch (Joka–Taratala) opened in 2022, and the extension to Majerhat opened on 6 March 2024. It runs largely above Diamond Harbour Road, with the main depot at Joka.

The line is being extended onward to Esplanade via Mominpur and Khidirpur. When that section opens it will connect the Purple Line into the wider network alongside the Blue and Green lines. For now it operates as a standalone corridor.

All 7 stations

Purple Line · Joka ↔ Majerhat

JokaTerminal
MajerhatTerminal

Travel times

FromToTime
JokaThakurpukur2 min
ThakurpukurSakher Bazar2 min
Sakher BazarBehala Chowrasta2 min
Behala ChowrastaBehala Bazar2 min
Behala BazarTaratala2 min
TaratalaMajerhat2 min

Approximate running times between adjacent stations during normal operation.

Did you know?

  • The Purple Line finally gave the populous Behala and Joka belt a direct rapid-transit link.
  • It runs mostly elevated along Diamond Harbour Road, one of the busiest arterials in south-west Kolkata.
  • Majerhat is built beside Majerhat railway station on the Sealdah–Budge Budge line.
  • An under-construction extension to Esplanade will eventually link the line to the Blue and Green corridors.

Connections and interchanges

The Purple Line is currently a standalone segment:

  • Majerhat — adjacent to Majerhat railway station (Sealdah South suburban services towards Budge Budge).
  • Future: the extension to Esplanade will create interchanges with the Blue and Green lines.
  • Buses and autos along Diamond Harbour Road connect every station to the surrounding neighbourhoods.

Schedule and frequencies

See the full timetable, departure intervals by time band and first/last train information for every station across the network.

calcutta metro
🔖

Bookmark this site before your next trip

We update kolkatametro.org the moment anything changes — schedule adjustments, service interruptions, fare updates and important Metro Railway, Kolkata notices. Save this page in your favourites and check it before travelling so you always have the latest information.

Frequently asked questions

About 12 minutes end to end on the Purple Line.
Roughly every 21 min at peak times on the Purple Line, with longer intervals off-peak and on Sundays. See the schedule for the full breakdown.
The Purple Line runs from approximately 07:00 to 22:00 on weekdays, with a later start on Sundays. Times vary slightly by station.
The Purple Line is shown in purple on all official Kolkata Metro maps and signage.